The Origin of NAINA — Why It Was Created

The Government of Maharashtra decided to develop a site for the Navi Mumbai International Airport (NMIA) at Ulwe. While granting Environmental Clearance (EC) and Coastal Regulation Zone (CRZ) clearance, the Ministry of Environment and Forests (MoEF) made a clear condition: the Development Plan for Navi Mumbai shall be revised and recast to plan for the growth that would inevitably surround the new airport — preventing the haphazard, uncontrolled development that plagues most airport peripheries in India.

CIDCO submitted a proposal to the Government vide letter No. CIDCO/PLNG/CP/2012/18 dated 17th January 2012, requesting its appointment as Special Planning Authority. The Government responded with notification No. TPS-1712/475/CR-98/12/UD-12 dated 10th January 2013, formally notifying the Navi Mumbai Airport Influence Notified Area (NAINA) and appointing CIDCO as SPA-NAINA under Section 40(1)(b) of the MRTP Act 1966.

Having worked on feasibility reports in this region since the early notification days, I can tell you firsthand — the NAINA DCPR is more nuanced than most practitioners realise, and the errors that come from treating it like a standard UDCPR jurisdiction are costly. This guide attempts to set that record straight.

📋

Official Gazette Reference: NAINA DCPRs were first approved under G.R.No. TPS 1717/MIS 2750/CR 91/2019/UD-12 dated 16.09.2019, published in the Maharashtra Government Gazette (Extraordinary Part I — Konkan Division supplement) on the same date. These regulations were prepared and published by SPA-NAINA under the powers of Section 40 of the MRTP Act 1966.

NAINA Coverage — 174 Villages Across 3 Talukas

The official Annexure 1 of the CIDCO Sanctioned DCPR lists the villages included in the IDP (23 villages) and the Development Plan of NAINA. The total count is 174 villages, all within Raigad district, spread across three talukas — Panvel (92 villages), Pen (77 villages), and Uran (5 villages). Note that all three talukas fall within Raigad district, not Thane.

NAINA Town Planning Schemes map showing TPS-1 through TPS-12 across Panvel, Pen and Uran talukas with land use zone colour coding — CIDCO Development Plan of NAINA
NAINA Town Planning Schemes (TPS-1 to TPS-12) — colour-coded by land use zone across Panvel, Pen and Uran talukas, Raigad district. Source: CIDCO Development Plan of NAINA. Click to view full size.
TalukaDistrictNo. of Villages% of Total
PanvelRaigad9252.9%
PenRaigad7744.3%
UranRaigad52.9%
TotalRaigad174100%

Complete Village List — Panvel Taluka (92 villages)

Panvel · 1–31
1Adai
2Akulwadi
3Akurli
4Ambe tarf taloje
5Ambe tarf waje
6Ambivali
7Apte
8Belavali
9Bherle
10Bhingar
11Bhingarwadi
12Bonshet
13Borle
14Cheravali
15Chikhale
16Chinchavali Tarf Taloje
17Chinchavali Tarf Waje
18Chinchavan
19Chindharan
20Chipale
21Chirvat
22Deharang
23Derawali
24Devad
25Dhamani
26Dhodani
27Dundre
28Gadhe
29Gulsunde
30Harigram
31Hedutane
Panvel · 32–62
32Kalhe
33Kanpoli
34Kevale
35Khairwadi
36Khanav
37Kherane Khurd
38Kolkhe
39Kon
40Kondale
41Kondap
42Koproli
43Koral
44Kudave
45Ladiwali
46Loniwadi
47Mahalungi
48Mahodar
49Maldunge
50Moho
51Mohope
52Morbe
53Mosare
54Nandgaon
55Nanoshi
56Nere
57Nevali
58Nitalas
59Nitale
60Palaspe
61Pale Budruk
62Pali Budruk
Panvel · 63–92
63Pali Khurd
64Palidevad
65Patnoli
66Posari
67Poyanje
68Ritghar
69Sangade
70Sangurli
71Shilottar Raichur
72Shiravali
73Shirdhon
74Shivansai
75Shivkar
76Tamsai
77Turade
78Turmale
79Umroli
80Usarli Budruk
81Usarli Khurd
82Vadavali
83Vakadi
84Valap
85Vavanje
86Vaveghar
87Vichumbe
88Vihighar
89Waje
90Wangani Tarf Taloje
91Wangani Tarf Waje
92Wardoli

Pen Taluka — 77 Villages

Pen · 93–118
93Ambivali
94Antore
95Bahiramwatak
96Balawali
97Benavale
98Beneghat
99Bori
100Borwe
101Borze
102Chinchghar
103Dadar
104Davansar
105Davre
106Dhavate
107Dhondpada
108Div
109Dolvi Dababa
110Dushmi
111Dutarfa Sapoli
112Govirle
113Hamrapur
114Hanumanpada
115Jite
116Johe
117Jui Budruk
118Jui Khurd
Pen · 119–144
119Kalave
120Kaleshriwadi
121Kandale
122Kandlepada
123Kane
124Kanhoba
125Kashmire (Kashmirwadi)
126Kauli Simadevi
127Khar Borli
128Khar Dubej
129Khar Dutarfa Borli
130Khar Nandai
131Khar Simadevi
132Kharkoshim
133Kharpada
134Kharsapoli
135Kolave
136Kopar
137Koproli
138Lakhola
139Masad Bedi / Masad Beli
140Masad Budruk
141Masad Khurd
142Meleghar
143Mothe Bhal
144Mothe vadhav
Pen · 145–169
145Nagadi Sapoli
146Narwel
147Navkhar
148Odhangi
149Patnoli
150Ramraj
151Rave
152Sarebhag
153Shinganvat
154Shirki
155Shirki Chawl No.1
156Shitole
157Sonkhar
158Tambadshet
159Tarankhop
160Turkhul
161Uchede
162Umbarde
163Urnilee (Urnoli)
164Vitthalwadi
165Wadhav
166Wadkhal
167Waredi
168Washi
169Wave

Uran Taluka — 5 Villages

Uran · 170–174 · Raigad
170Dighode
171Kanthavali
172Pohi
173Ransai
174Veshvi

Source: Annexure 1, CIDCO Sanctioned DCPR for Development Plan of NAINA (pp. 161–165). All 174 villages are in Raigad district.

NAINA Scheme — Minimum Requirements (Table 13.1)

The NAINA Scheme allows landowners to unlock enhanced FSI in exchange for surrendering a portion of their land to SPA-NAINA. Eligibility depends on the minimum aggregated plot area and zone. The LDZ minimum was officially revised from 25 ha to 20 ha via Sanctioned Modification SM-62.

Sr.NAINA Scheme Permitted InMinimum AreaLand to SurrenderConditions
1Gaothan and Urban Village in Phase-I4.0 ha40%Entire land must be within Gaothan / Urban Village Zone
2Areas outside Urban Village in Phase-I7.5 ha to <10 ha50%—
10 ha and above40%
3LDZ (Limited Development Zone)25 ha 20 ha (SM-62)40%Revised per Sanctioned Modification SM-62
4Industrial & Warehousing Zone10 ha and above40%—
⚠️

LDZ SM-62 Correction: Many practitioners still use 25 ha for LDZ minimum. The correct figure is 20 ha per SM-62. Access requirement: 20m DP road (12m for Urban Village).

Table 13.2 — Mandatory Amenities

Under Regulation 13.4.5, a minimum of 5% of land retained must be developed as amenity space — schools, Daily Bazaars, and Primary Health Centres — in that priority order. The developer must build and maintain these.

Sr.Scheme Area (Ha)Area Retained (Ha)Amenity Area @ 5% (sq.m.)Amenities Required
14.02.401,2001 PHC + 1 DB
27.53.751,8751 PHC + 1 DB
3106.03,0001 S
4159.04,5001 S + 1 DB
52012.06,0001 S + 1 PHC + 1 DB
63018.09,0002 S + 1 PHC + 1 DB
74024.012,0002 S + 2 PHC + 2 DB
8Above 4024.0+12,000+As per Note 2
DB = Daily Bazaar  |  S = Primary & Secondary School  |  PHC = Primary Health Centre  |  Note 2: For >40 ha, work in multiples of 40 ha and add balance from table.
📌

Critical — Amenity Plot FSI: The FSI of the amenity plot is exclusively for use on that plot. It cannot be transferred to the main development. If scheme population increases due to TDR, additional amenity space is mandatory regardless of the 5% threshold (SM-41).

Zone-wise FSI Norms

ZonePlot Area RangeBasic FSIPremium FSINotes
GaothanBelow 40,000 sq.m.1.000Below scheme threshold
40,000 – 2,50,000 sq.m.1.700Scheme eligible
Above 2,50,000 sq.m.1.800Large scheme
Urban Village (R3/N4)Below 40,000 sq.m.0.700.30Premium available
40,000 – 2,50,000 sq.m.1.700Scheme eligible
Above 2,50,000 sq.m.1.800Large scheme
Residential / Mixed (R1/R2)Below 75,000 sq.m.0.200.30Below threshold
75,000 – 99,999 sq.m.2.0007.5 ha to <10 ha
1,00,000 sq.m. and above1.70010 ha+ (40% surrender)
LDZ (N7)Below 2,00,000 sq.m.0.200Below 20 ha (SM-62)
2,00,000 sq.m. and above1.700Scheme eligible from 20 ha
Industrial (N6)Below 1,00,000 sq.m.0.500.50Below threshold
1,00,000 sq.m. and above1.700Scheme eligible
Recreational (R4/N5)All sizes0.200No TDR permissible

TDR Multipliers — By Road Width

Abutting Road WidthTDR Multiplier (on Balance Plot Area)
30 m and above1.40
24 m to <30 m1.15
18 m to <24 m0.90
12 m to <18 m0.65
9 m to <12 m0.40
Below 9 m0 — TDR not permissible

Worked Example — 1,00,000 sq.m. Residential Plot

To illustrate how the NAINA FSI Engine calculates development potential, consider a Residential zone plot of exactly 1,00,000 sq.m. (10 ha) with a 24m abutting road and no Gaothan area:

NAINA FSI Calculation — 1,00,000 sq.m. Residential Zone
Plot Area : 1,00,000 sq.m. (10 ha) → Residential Zone Gaothan Area : 0 sq.m. Balance Plot : 1,00,000 sq.m. NAINA Scheme Check : 1,00,000 sq.m. = 10 ha → ELIGIBLE (10 ha and above) Land Surrender (40%): 1,00,000 × 0.40 = 40,000 sq.m. surrendered to SPA-NAINA Remaining Plot : 1,00,000 − 40,000 = 60,000 sq.m. Amenity Space (5%) : 60,000 × 0.05 = 3,000 sq.m. (1 School required — Table 13.2) Net Final Plot : 60,000 − 3,000 = 57,000 sq.m. Basic FSI (1.70) : 1.70 × 57,000 = 96,900 sq.m. built-up area TDR (road 24m=1.15) : 1.15 × 1,00,000 = 1,15,000 sq.m. (on balance plot) → In-Situ TDR : from DP/Reservation deductions × 2 → Slum TDR (20%) : 20% of remaining TDR → Regular TDR (80%): 80% of remaining TDR EWS Required : 96,900 × 0.10 = 9,690 sq.m. Ancillary FSI (60%) : (Basic + TDR) × 0.60 (residential use)

Table 31.3 — Land Use Zones at a Glance

CodeZone NameNAINA CodePrimary Character
R1Predominantly ResidentialN1Housing, institutional, limited commercial
GCGrowth Centre Reservation—Mixed development nodes near airport
R2Mixed UseN3Residential + commercial + institutional
R3Urban VillageN4Existing gaothan / urban village settlements
R4Recreation ZoneN5Parks, sports — restricted development
IIndustries & WarehousingN6Industrial, logistics, warehousing
LDZLimited Development ZoneN7Low-density; agricultural fringe areas

6 Costly Mistakes in NAINA Feasibility

  1. Applying UDCPR FSI to NAINA plots. NAINA has its own DCPR. FSI values, TDR norms, and setbacks are entirely different — the single most common error I see.
  2. Using 25 ha for LDZ minimum. The correct figure is 20 ha post SM-62. A scheme that appears to fall short at 25 ha may well be eligible at 20 ha.
  3. Missing the amenity type requirement. A 10 ha scheme needs 1 School, not a PHC or DB. Getting this wrong triggers rejection at approval stage.
  4. Applying TDR without checking road width. TDR is zero below 9m. Two identical plots on a 12m vs 24m road have dramatically different development potential.
  5. Using amenity plot FSI on the main development. It is locked to the amenity plot exclusively.
  6. Ignoring the gaothan area split. Different FSI applies inside vs outside gaothan. A single FSI across the whole plot gives incorrect results every time.

Run Your NAINA Feasibility Correctly — in Under 3 Minutes

FSI Atlas's NAINA module applies all DCPR rules automatically and outputs a professional report.

Try FSI Atlas Free →
AM

Ar. Anup Mahajan

Founder, FSI Atlas

The founder of FSI Atlas — Maharashtra's feasibility intelligence platform developed by an architect, for architects and developers. The NAINA FSI Engine reflects all sanctioned modifications including SM-41, SM-61, SM-62, and SM-100. If your NAINA calculation looks off, it is almost always one of the six mistakes listed above.