What is Ancillary Area FSI under UDCPR?

Ancillary Area FSI is additional floor space that UDCPR 2020 allows a developer to build over and above the FSI already sanctioned on a plot, on payment of a premium to the planning authority. It is permitted up to 60% of the proposed FSI for residential use and 80% for non-residential use, and the premium is charged as a percentage of the land rate in the Annual Statement of Rates (ASR).

Two things make it unusual, and both are routinely misunderstood.

First, the 60% or 80% is not calculated on Basic FSI. It is calculated on the proposed FSI in the development permission — which is Basic FSI plus Premium FSI plus TDR, added together. That single distinction is worth more built-up area than almost any other provision in UDCPR, and getting it wrong understates a project's potential by a wide margin.

Second, Ancillary Area FSI sits outside the maximum permissible FSI cap. When a UDCPR scheme says "maximum FSI 3.00", that ceiling is reached before ancillary FSI is applied. The ancillary component is then added on top.

The one-line version

Add up Basic FSI, Premium FSI and TDR. Multiply that total by 1.60 for residential or 1.80 for non-residential. That is your buildable FSI once Ancillary Area FSI is purchased — and the premium is paid as a percentage of the ASR land rate.

Why UDCPR Created Ancillary FSI in the First Place

Ancillary Area FSI did not appear out of generosity. It was the compensating half of a trade that UDCPR 2020 made when it changed how common areas are counted.

Under the older municipal DC Rules that UDCPR replaced, a long list of common areas sat outside the FSI computation — lift wells and lift lobbies, staircases, entrance lobbies, common passages, service areas and similar spaces. Architects designed around this. Because those areas were free, there was a standing incentive to make them generous, and the gap between a building's sanctioned FSI and its actual constructed bulk grew steadily wider. The sanctioned number stopped describing the building.

UDCPR 2020 closed that gap by bringing those common areas into the FSI count. On its own, that change would have shrunk every project overnight. So the regulation paired it with Ancillary Area FSI: the common areas now count against you, but you may buy back 60% (residential) or 80% (non-residential) of your proposed FSI to cover them.

Understanding this origin explains the two features that otherwise look arbitrary — why the percentage is so large, and why non-residential gets more than residential. Offices, malls and hospitals carry proportionally heavier cores, lobbies, service shafts and circulation than apartment buildings do, so the buy-back is sized accordingly.

💡

Why this matters in practice: an architect who treats ancillary FSI as "bonus FSI" will over-estimate the saleable area it produces. A large part of it is absorbed by the very common areas that are now chargeable. The honest way to read it is as a correction that keeps net saleable area roughly where it used to be — with the surplus above that being the genuine gain.

How Much Ancillary FSI You Get — 60% and 80%

The entitlement splits on use, not on zone or city:

Use Ancillary Area FSI permitted Multiplier on proposed FSI
Residential Up to 60% of proposed FSI × 1.60
Non-residential (commercial, office, retail, hospital, hotel, educational) Up to 80% of proposed FSI × 1.80
Industrial Up to 80% of proposed FSI × 1.80
The word to hold on to is "up to". Ancillary Area FSI is optional and may be taken in full, in part, or not at all. A developer who does not need the extra bulk simply does not buy it, and pays no premium.

The Base It Is Calculated On — the Most Misunderstood Point

This is where most calculations go wrong, and it is worth stating flatly.

The 60% or 80% applies to the proposed FSI in the development permission. That figure is the sum of:

  • Basic FSI — the base entitlement for the plot, by zone and road width
  • Premium FSI — the additional FSI purchased from the authority at a premium
  • TDR — Transferable Development Rights loaded onto the plot

It is not 60% of Basic FSI alone. The difference is large enough to change whether a project is viable.

⚠️

The error to avoid. Inclusive Housing under Regulation 3.8 is calculated on Basic FSI only. Ancillary Area FSI is calculated on Basic + Premium + TDR. Two provisions, two different bases — and because professionals work with both, the habit formed on one gets carried onto the other. On a plot with Basic 1.10, Premium 0.30 and TDR 0.30, reading the ancillary base as Basic FSI alone understates the entitlement by roughly 55%.

Worked Calculation Example

Take a 2,000 sq.m. plot in a non-congested area, with Basic FSI 1.10, Premium FSI 0.30 and TDR 0.30 loaded.

Step FSI Built-up area (sq.m.)
Basic FSI1.102,200
Premium FSI0.30600
TDR loaded0.30600
Proposed FSI — the ancillary base1.703,400
Ancillary FSI — residential, 60% of 1.701.022,040
Total buildable — residential2.725,440
Ancillary FSI — non-residential, 80% of 1.701.362,720
Total buildable — non-residential3.066,120
Note what happened. A plot whose "maximum FSI" reads 1.70 on the sanctioned tables delivers a buildable 2.72 or 3.06 once ancillary FSI is purchased. The headline FSI number in any UDCPR table is not the building you can construct.

Had the ancillary base been misread as Basic FSI alone, the residential entitlement would have come out at 0.60 × 1.10 = 0.66, or 1,320 sq.m. — against the correct 2,040 sq.m. That is 720 sq.m. of built-up area left on the table on a plot of just 2,000 sq.m.

Premium Payable — Rates by Authority

Ancillary Area FSI is never free. The premium is computed as a percentage of the land rate in the Annual Statement of Rates (ASR) — the same valuation table commonly called the ready reckoner — and the percentage varies by authority.

Planning authority / area Premium rate (% of ASR land rate)
Pune and Thane Municipal Corporations15%
Nagpur, Nashik and other MMR Municipal Corporations (except Thane)10%
Metropolitan Development Authority areas10%
All other Municipal Corporations10%
Municipal Councils, Nagar Panchayats and Regional Plan areas10%
Pune and Thane sit at the higher rate. Because ASR land rates in those two jurisdictions are also among the highest in the state, the premium cost per square metre of ancillary area can be several times what the same area costs in a Municipal Council area — a point that matters when comparing sites across regions.
⚠️

Confirm the computation basis before you budget. The rate table above is well established, but the precise basis on which the premium is applied — and the ASR rate and year the authority will use — should be confirmed with the planning authority for your specific project before the figure goes into a feasibility. Premium rates and ASR values are both revised periodically, and an outdated ASR year can move the number materially.

Ancillary FSI Premium by City — Quick Reference

The regulation sets the premium by category of authority rather than by naming every city. The table below maps those categories onto the authorities architects actually file with, so the applicable rate can be read off directly.

Planning authority Rate category under the regulation Premium
Pune Municipal Corporation (PMC)Named explicitly15%
Thane Municipal Corporation (TMC)Named explicitly15%
Pimpri-Chinchwad Municipal Corporation (PCMC)Other Municipal Corporations10%
Nashik Municipal Corporation (NMC)Named explicitly10%
Nagpur Municipal CorporationNamed explicitly10%
Navi Mumbai, Kalyan-Dombivli, Mira-Bhayandar, Vasai-Virar, Panvel, Bhiwandi, UlhasnagarOther MMR Municipal Corporations10%
PMRDA, MMRDA and other Metropolitan Development Authority areasMetropolitan Development Authority10%
Chhatrapati Sambhajinagar, Kolhapur, Solapur, Amravati and other Municipal CorporationsOther Municipal Corporations10%
Municipal Councils and Nagar PanchayatsNamed explicitly10%
Regional Plan areasNamed explicitly10%
The rate categories and the 15% / 10% figures are from the regulation. Mapping an unnamed authority onto a category — PCMC into "other Municipal Corporations", for instance — is an editorial reading, and the percentage is only half the cost anyway: the ASR land rate it multiplies varies enormously between these jurisdictions. Confirm both the rate and the ASR year with the authority handling your file.

Note the practical consequence for site comparison. Pune at 15% on a high ASR rate and a Municipal Council at 10% on a low one are not a 1.5× difference in premium cost per square metre — they can differ by a multiple, because the ASR gap is usually wider than the rate gap. Ancillary FSI is cheap bulk in small towns and expensive bulk in the metros, which quietly shifts where the provision is worth taking in full.

What Ancillary Area Actually Covers

Ancillary area is, broadly, the supporting and common space that serves a building rather than forming part of its usable tenement area — the same category of space that older DC Rules kept outside FSI and UDCPR 2020 brought inside. In a typical building that means circulation and service space: lift wells and lift lobbies, staircases and staircase lobbies, entrance lobbies, common passages, and service and utility areas.

The practical consequence is that ancillary FSI and ancillary area are not the same thing and should not be conflated. The FSI is a quantum you purchase; the area is what you spend it on. If the common areas in your design consume less than the ancillary FSI you have bought, the balance is available for other use; if they consume more, the ancillary entitlement is already exhausted before you reach any additional saleable space.

📋

Verify the list locally. Which specific areas a planning authority treats as ancillary — and how each is measured — is applied through that authority's own practice and circulars. Confirm the list with the authority handling your file before finalising areas, rather than carrying an assumption across from another city.

Ancillary FSI vs Premium FSI vs TDR

These three are the most commonly confused instruments in UDCPR, partly because all three add buildable area and two of them cost money. They behave quite differently.

  Ancillary Area FSI Premium FSI TDR
What it is Buy-back for common areas now counted in FSI Extra FSI purchased from the authority Development rights generated elsewhere, loaded here
How much 60% residential / 80% non-residential of proposed FSI Fixed quantum by zone and road width Capped by zone and road width
Calculated on Basic + Premium + TDR Basic FSI / plot area Plot area
What you pay % of ASR land rate to the authority % of ASR land rate to the authority Market price to a TDR holder
Bought from Planning authority Planning authority Private market
Inside the max FSI cap? No — over and above Yes Yes
Counts toward the ancillary base? — Yes Yes

The last two rows carry the real insight. Premium FSI and TDR both enlarge the base on which ancillary FSI is then calculated, which means buying Premium FSI or loading TDR has a compounding effect. Each additional unit of Premium FSI brings with it a further 0.60 or 0.80 units of ancillary entitlement. A feasibility that prices Premium FSI without accounting for the ancillary FSI it unlocks is valuing it at well under what it is worth.

Where Ancillary FSI Applies — and Where It Does Not

Ancillary Area FSI is broad in application. It is available across zones and building types, and it extends to most of the special schemes in UDCPR rather than being confined to ordinary development:

ContextAncillary FSI available?
Ordinary residential and commercial development, all zonesYes
TOD (Transit-Oriented Development) schemesYes
PMAY housingYes
Integrated Township Projects (ITP)Yes
IT / ITES buildingsYes — at 80%
MHADA schemesYes
Industrial buildingsYes — at 80%, on a modified base
SRA — rehabilitation componentNo
The SRA exclusion applies to the rehabilitation component specifically. Slum rehabilitation already operates on its own incentive-FSI mechanism, and layering an ancillary entitlement on the rehab component would double up on the same benefit.

Ancillary FSI in NAINA and CIDCO Areas

NAINA — the Navi Mumbai Airport Influence Notified Area, where CIDCO acts as Special Planning Authority — is a common source of confusion, because NAINA operates under its own sanctioned DCPR rather than directly under UDCPR.

The position is now settled, and it is settled in favour of ancillary FSI.

📋

Ancillary Area FSI applies in NAINA. It was introduced into the NAINA DCPR by Government notification No. TPS-1222/390/Pr.Kr.127/23/NV-12 dated 15 March 2024, issued under Section 40 of the Maharashtra Regional and Town Planning Act, 1966 and published in the Maharashtra Government Gazette, Extraordinary, Part One — Konkan Divisional Supplement, No. 49, 15 March 2024. The provision sits in the Notes below Table 15.1 of the NAINA DCPR, at item 11.

What the sanctioned NAINA provision says

The sanctioned text permits ancillary area FSI up to 60% of the proposed FSI in the development permission, where proposed FSI expressly includes Basic FSI, Premium FSI and TDR, but excludes the area covered under Regulation No. 22.6 — the free-of-FSI items such as projections, stilts, podiums, basements and service slabs. For non-residential use the extent is up to 80%.

Premium is payable at 10% of the land rate in the Annual Statement of Rates. Annexure 3 of the NAINA DCPR, in the Scale of Fees and Charges for the Development Plan Area, puts this beyond doubt on the point practitioners most often get wrong: the rate applied is the NA land rate in the ASR of the year in which permission is granted — not the year of application, and not the year the plot was acquired.

The entitlement is available to all buildings in all zones on payment of premium, and extends to TOD, PMAY, ITP, IT and MHADA schemes. The only carve-out is the rehabilitation component in SRA. The regulation also provides that no separate calculation is required — the entire FSI in the development permission is measured with reference to permissible FSI, premium FSI, TDR and additional FSI, with ancillary area FSI added therein — and that free-of-FSI items in those schemes, other than those mentioned in the DCPR, stand deleted.

 UDCPR (rest of Maharashtra)NAINA DCPR (as sanctioned 15 March 2024)
Residential60%60%
Non-residential80%80%
BaseBasic + Premium + TDRBasic + Premium + TDR, excluding Regulation 22.6 areas
Premium15% of ASR land rate (Pune, Thane); 10% elsewhere10% of NA land rate in the ASR of the year permission is granted
Zones / buildingsAllAll
Schemes coveredTOD, PMAY, ITP, IT, MHADATOD, PMAY, ITP, IT, MHADA
ExcludedSRA rehabilitation componentSRA rehabilitation component
The headline percentages are identical, so a NAINA feasibility can be modelled on the familiar 60 / 80 logic. The two differences that bite are the exclusion of Regulation 22.6 areas from the base, which narrows it, and the ASR year being fixed to the year of grant rather than left open.

One detail the Government changed — and it matters

The notification sets SPA-NAINA's proposed text against what Government actually sanctioned, and the two differ in a way that is easy to miss and expensive to get wrong.

SPA-NAINA proposed a proviso reading that ancillary FSI on net plot area "shall be applicable only after utilizing premium FSI or TDR". That proviso does not appear in the version Government sanctioned. The precondition was dropped. A developer in NAINA is therefore not required to exhaust premium FSI or TDR before drawing on the ancillary entitlement — which changes the order of operations in a feasibility, and changes it in the developer's favour.

Government also narrowed the SRA exclusion. SPA proposed excluding SRA outright; the sanctioned text excludes only the rehabilitation component in SRA, leaving the sale component within scope.

Also worth noting

Item 12 of the same Notes provides that the maximum permissible building potential on the plot is exclusive of FSI allowed for Inclusive Housing under Annexure 4 — so the Inclusive Housing component sits outside the figure that the ancillary calculation then works on.

How this sits with NAINA's own FSI vocabulary

NAINA still runs its own premium structure alongside this. The sanctioned NAINA DCPR works on a Base FSI — the FSI permissible without levy of premium or TDR (Regulation 2.17) — plus an FSI Linked Premium (FLP), the premium payable to SPA-NAINA for FSI availed above Base FSI (Regulation 2.59). FLP is levied at the Commencement Certificate stage, and Gaothan areas are exempt from it (Regulation 11.2.10). Anyone arriving from a UDCPR jurisdiction should expect this vocabulary alongside the familiar ancillary calculation. Our NAINA DCPR guide covers the scheme structure, FSI rules and the 174 villages in detail.

Separately, CIDCO has been applying ancillary area FSI administratively for some time. In its Pushpak Nagar node — the Rehabilitation and Resettlement site for Navi Mumbai International Airport project affected persons — CIDCO finalised a standard operating procedure for issuing Ancillary Area FSI NOCs over and above the basic FSI of 1.5, citing the 60% residential figure. Applications run through a prescribed format approved by the Chief Land and Survey Officer, are processed after Finance Department clearance, and are approved by CIDCO management. Practitioners should budget for that NOC step, which has no equivalent in an ordinary municipal corporation filing.

Mumbai is Different — Fungible FSI under DCPR 2034

Greater Mumbai does not use UDCPR. It runs on DCPR 2034, and it has no provision called ancillary FSI. What it has instead is Fungible Compensatory Area under Regulation 31(3) — a provision built on exactly the same logic, which is why the two are so often confused and so often mixed up in cross-city feasibility work.

Fungible FSI has the same origin story. The Development Control Regulations for Greater Mumbai 1991, as amended in January 2012, brought a set of previously free areas — balconies, flower beds, terraces, voids and niches — into the FSI count, and granted compensating area in exchange. UDCPR did the same thing for a different list of areas eight years later. Same mechanism, different regulation, different numbers.

  Ancillary Area FSI Fungible Compensatory Area
Applies inMaharashtra under UDCPR — Pune, Thane, Nashik, Nagpur, PMRDA and the rest of the stateGreater Mumbai (MCGM)
RegulationUDCPR 2020, Chapter 6DCPR 2034, Regulation 31(3) — originating in DCR 1991 as amended January 2012
Residential60%35%
Non-residential80%20% — industrial and commercial
Calculated onProposed FSI — Basic + Premium + TDRAdmissible FSI / built-up area
Compensates forLifts, lobbies, staircases, passages and service areas brought into FSIBalconies, flower beds, terraces, voids and niches brought into FSI
Premium% of ASR land rate — 15% Pune and Thane, 10% elsewhere% of Ready Reckoner rate, varying by use and revised periodically
Outside the max FSI cap?YesYes
The fungible premium percentages have been revised more than once since 2012 and published sources disagree on the current figures. Treat the structure above as reliable and the fungible premium rate as something to confirm with MCGM against the current notification. Certain rehabilitation and government or institutional projects receive fungible area without premium.

The practical warning is simple. A developer or architect working across both jurisdictions cannot carry one set of numbers into the other. A Mumbai project does not get 60%, and a Pune project does not get 35% — and because the two are calculated on different bases and compensate for different lists of areas, the gap between them is wider than the headline percentages suggest.

Industrial Buildings — the 80% Variant

Industrial buildings receive ancillary FSI at 80%, the non-residential rate, but the base is defined slightly differently. For industrial development the ancillary quantum is computed on Basic and Premium FSI, with areas falling under the separate provision for areas not counted in FSI excluded from that base.

For an industrial project this usually means the ancillary base is narrower than the headline figure suggests, and the gap between an 80% entitlement calculated correctly and one calculated on total proposed FSI can be substantial. Industrial feasibilities should be worked on the industrial base rather than carrying over the general rule.

Mixed-Use and Composite Buildings

A building that is part residential and part commercial does not pick one rate. In mixed-use composite buildings, premium and ancillary FSI are prorated between the uses — the residential portion draws ancillary FSI at 60% and the non-residential portion at 80%, in proportion to the area each use occupies.

This is more consequential than it first appears. On a scheme with ground-floor retail and residential above, shifting the use split changes not only the saleable mix but the ancillary entitlement and the premium payable. A 70:30 residential-to-commercial split and a 60:40 split produce different total buildable areas and different premium liabilities on the same plot — which makes the use split a variable worth testing rather than assuming.

What Ancillary FSI Does to Feasibility

Three effects are worth carrying into any feasibility model.

It changes what a plot is worth. A plot assessed at 1.70 FSI and a plot assessed at 2.72 are different assets. Land pricing that works off the sanctioned FSI tables without applying the ancillary multiplier systematically undervalues sites — which is precisely why a buyer who models it correctly can outbid one who does not and still make the return.

It makes non-residential relatively more attractive than the headline FSI suggests. The 80% versus 60% gap compounds against every unit of Basic FSI, Premium FSI and TDR on the plot. On the worked example above, the non-residential case yields 680 sq.m. more than the residential case on the same 2,000 sq.m. plot, before any difference in rate per square metre is considered.

It is a cost, not a windfall. The premium is payable to the authority and lands early in the cash-flow, typically well before revenue. A project that takes the full ancillary entitlement on an expensive ASR plot in Pune or Thane carries a materially larger upfront liability than the same project in a Municipal Council area. The right question is not "how much ancillary FSI can I get" but "how much of it earns its premium".

Ancillary FSI is rarely assessed in isolation. On a live project it collides with several other provisions, and the interactions decide the final numbers:

  • Inclusive Housing (Regulation 3.8) — triggered on qualifying residential plots of 4,000 sq.m. or more, and calculated on Basic FSI only. Ancillary FSI does not enlarge the Inclusive Housing obligation, but the two must be modelled together because they pull the saleable mix in opposite directions.
  • Parking norms (Chapter 8) — the provision most likely to cap ancillary FSI in practice. Extra built-up area generates extra parking demand, and on a tight plot the basement or podium runs out of room before the ancillary entitlement is exhausted. Ancillary FSI you cannot park is ancillary FSI you cannot build.
  • IITP and IT/ITES projects — draw the 80% non-residential rate, on top of the already higher FSI these schemes permit. The compounding here is the strongest in UDCPR.
  • CIDCO areas under Clause 10.14 — carry their own FSI mechanism, and ancillary entitlement has to be read against that framework rather than the general tables.
  • PMRDA jurisdiction — now under UDCPR following the cancellation of the PMRDA DCPR, which brings ancillary FSI into play across that area at the Metropolitan Development Authority rate.

For a structured way to carry all of these into a single model, see our complete guide to real estate feasibility studies.

Common Mistakes in Ancillary FSI Calculation

  • Calculating on Basic FSI alone. The single most expensive error. The base is Basic + Premium + TDR.
  • Treating the scheme's maximum FSI as the ceiling. Ancillary FSI sits outside that cap; the stated maximum is where the ancillary calculation starts, not where it ends.
  • Assuming ancillary FSI is all saleable. A large share is consumed by the common areas that are now chargeable. Model net saleable area, not gross entitlement.
  • Applying 60% to a mixed-use building wholesale. The two rates are prorated across uses.
  • Carrying the general base onto an industrial project. Industrial uses a different base.
  • Using a stale ASR year. The premium follows the ASR rate the authority applies, and that is revised periodically.
  • Forgetting it is optional. Ancillary FSI can be taken in part. On a site where the premium outruns the value of the extra area, taking less is the correct answer.

Frequently Asked Questions

What is ancillary FSI in UDCPR?

Ancillary Area FSI is additional floor space allowed over and above the FSI already sanctioned on a plot under UDCPR 2020, granted on payment of a premium to the planning authority. It is permitted up to 60% of the proposed FSI for residential use and 80% for non-residential use. It was introduced to compensate for UDCPR bringing common areas — lifts, lobbies, staircases and passages — into the FSI computation, where earlier DC Rules had kept them outside it.

Is ancillary FSI calculated on Basic FSI or on total FSI?

On the total proposed FSI in the development permission — that is, Basic FSI plus Premium FSI plus TDR combined. It is not calculated on Basic FSI alone. This is the most common and most expensive error in ancillary FSI calculation. For a plot with Basic 1.10, Premium 0.30 and TDR 0.30, the ancillary base is 1.70, not 1.10.

How much is the premium for ancillary FSI in Maharashtra?

The premium is a percentage of the land rate in the Annual Statement of Rates (ASR). It is 15% for Pune and Thane Municipal Corporations, and 10% for Nagpur, Nashik, other MMR Municipal Corporations, Metropolitan Development Authority areas, all other Municipal Corporations, Municipal Councils, Nagar Panchayats and Regional Plan areas. Confirm the applicable ASR year and computation basis with your planning authority before budgeting.

Is ancillary FSI over and above the maximum permissible FSI?

Yes. Ancillary Area FSI sits outside the maximum permissible FSI cap stated in UDCPR schemes. When a scheme states a maximum FSI of 3.00, that figure is reached before ancillary FSI is applied, and the ancillary component is added on top. This is why the headline FSI number in a UDCPR table does not describe the building that can actually be constructed.

What is the difference between ancillary FSI and premium FSI?

Premium FSI is a fixed additional quantum of FSI purchased from the authority, determined by zone and road width, and it counts within the maximum permissible FSI. Ancillary FSI is a percentage uplift — 60% or 80% — calculated on the total proposed FSI including Premium FSI and TDR, and it falls outside the maximum FSI cap. Both are paid for as a percentage of the ASR land rate. Crucially, buying Premium FSI enlarges the base on which ancillary FSI is calculated, so the two compound.

Is ancillary FSI mandatory, or can I take only part of it?

It is entirely optional. The regulation permits ancillary FSI "up to" 60% or 80%, and utilisation may be full or partial. A developer who does not need the additional bulk simply does not purchase it and pays no premium. On sites where the ASR land rate is high relative to achievable sale values, taking only part of the entitlement is often the better commercial decision.

Does ancillary FSI apply to TOD, PMAY, IT and MHADA schemes?

Yes. Ancillary Area FSI extends to TOD schemes, PMAY housing, Integrated Township Projects, IT and ITES buildings, and MHADA schemes. IT and ITES buildings draw the 80% non-residential rate. The principal exclusion is the rehabilitation component of SRA schemes, which operates on its own incentive-FSI mechanism.

How is ancillary FSI handled in a mixed-use building?

Premium and ancillary FSI are prorated between the uses. The residential portion draws ancillary FSI at 60% and the non-residential portion at 80%, in proportion to the area each use occupies. Changing the use split therefore changes both the total buildable area and the premium payable, which makes the split worth testing rather than fixing at the outset.

Does ancillary FSI apply to industrial buildings?

Yes, at 80%, but on a differently defined base. For industrial buildings the ancillary quantum is computed on Basic and Premium FSI, with areas falling under the separate provision for areas not counted in FSI excluded. Industrial feasibilities should use this narrower base rather than the general Basic + Premium + TDR rule.

Does ancillary FSI increase the saleable area of a project?

Partly, but less than the headline percentage suggests. Ancillary FSI was introduced to offset UDCPR bringing common areas into the FSI count, so a significant share of it is absorbed by lifts, lobbies, staircases and passages that are now chargeable. The genuine gain is the surplus remaining after those areas are accounted for. Feasibility models should work from net saleable area rather than gross ancillary entitlement.

Why is the ancillary rate higher for non-residential buildings?

Because non-residential buildings carry proportionally more common and service area. Offices, malls, hospitals and hotels need larger cores, lift banks, entrance lobbies, service shafts and circulation than apartment buildings do. Since ancillary FSI exists to offset those now-chargeable areas, the entitlement is sized to the typical burden — 80% for non-residential against 60% for residential.

Does ancillary FSI apply in NAINA?

Yes. Ancillary Area FSI was introduced into the NAINA DCPR by Government notification No. TPS-1222/390/Pr.Kr.127/23/NV-12 dated 15 March 2024, published in the Maharashtra Government Gazette Extraordinary, Konkan Divisional Supplement No. 49. It appears in the Notes below Table 15.1. The entitlement is up to 60% of the proposed FSI for residential use and up to 80% for non-residential use, where proposed FSI includes Basic FSI, Premium FSI and TDR but excludes areas covered under Regulation 22.6. Premium is 10% of the NA land rate in the Annual Statement of Rates of the year in which permission is granted. It applies to all buildings in all zones and to TOD, PMAY, ITP, IT and MHADA schemes, except the rehabilitation component in SRA.

Does ancillary FSI apply in Mumbai under DCPR 2034?

No. Greater Mumbai runs on DCPR 2034, not UDCPR, and DCPR 2034 has no provision called ancillary FSI. The equivalent is Fungible Compensatory Area under Regulation 31(3) — up to 35% for residential and 20% for industrial and commercial development, granted on payment of a premium calculated as a percentage of the Ready Reckoner rate. It serves the same purpose: compensating for areas such as balconies, flower beds, terraces, voids and niches that DCR 1991, as amended in January 2012, brought into the FSI count.

What is the difference between ancillary FSI and fungible FSI?

They are the same idea under two different regulations. Ancillary Area FSI applies in Maharashtra under UDCPR at 60% residential and 80% non-residential, calculated on Basic plus Premium plus TDR, and compensates for lifts, lobbies, staircases and passages. Fungible Compensatory Area applies in Greater Mumbai under DCPR 2034 Regulation 31(3) at 35% residential and 20% industrial and commercial, calculated on admissible FSI, and compensates for balconies, flower beds, terraces, voids and niches. Both sit outside the maximum permissible FSI cap and both are paid for as a percentage of the land rate. The figures are not interchangeable between the two jurisdictions.

Does ancillary FSI trigger an additional Inclusive Housing obligation?

No. Inclusive Housing under UDCPR Regulation 3.8 is calculated on Basic FSI only. Premium FSI, TDR and ancillary FSI do not attract a separate or additional Inclusive Housing requirement. Note the asymmetry worth remembering: Inclusive Housing takes Basic FSI as its base, while ancillary FSI takes Basic plus Premium plus TDR.

References and Sources

  • Unified Development Control and Promotion Regulations for Maharashtra State — Government of Maharashtra, Urban Development Department, sanctioned 2 December 2020. Ancillary Area FSI is provided for in Chapter 6, which governs FSI computation and entitlement.
  • UDCPR Chapter 6 — Table 6-G and related FSI provisions for congested and non-congested areas.
  • Annual Statement of Rates (ASR), Department of Registration and Stamps, Government of Maharashtra — the valuation basis on which the ancillary premium is computed.
  • Planning authority circulars and practice notes — for the applicable ASR year, the premium computation basis, and the authority's own treatment of ancillary areas.
  • Government of Maharashtra, Urban Development Department, Notification No. TPS-1222/390/Pr.Kr.127/23/NV-12 dated 15 March 2024, issued under Section 40 of the Maharashtra Regional and Town Planning Act, 1966 — revisions to the NAINA Development Control and Promotion Regulations. Published in the Maharashtra Government Gazette, Extraordinary, Part One, Konkan Divisional Supplement No. 49, 15 March 2024. Ancillary area FSI appears at item 11 of the Notes below Table 15.1; the premium rate and ASR year appear in Annexure 3, Scale of Fees and Charges for the Development Plan Area.
  • Sanctioned Development Control and Promotion Regulations for NAINA — CIDCO as Special Planning Authority (appointed vide Notification No. TPS-1712/475/Pr.Kr.98/12/NV-12 dated 10 January 2013). Base FSI is defined at Regulation 2.17 and FSI Linked Premium (FLP) at Regulation 2.59; Gaothan areas are exempt from FLP under Regulation 11.2.10. Regulation 22.6 lists the free-of-FSI items excluded from the ancillary base.
  • CIDCO standard operating procedure for issuance of Ancillary Area FSI NOC, Pushpak Nagar Rehabilitation and Resettlement node.
  • Development Control and Promotion Regulations for Greater Mumbai, 2034 — Regulation 31(3), Fungible Compensatory Area; originating in the Development Control Regulations for Greater Mumbai 1991 as amended January 2012.
  • Annual Statement of Rates / Ready Reckoner, Department of Registration and Stamps, Government of Maharashtra — for both the UDCPR ancillary premium and the DCPR 2034 fungible premium.
⚠️

This article is a professional reference, not a substitute for sanction. UDCPR has been amended repeatedly since December 2020, and planning authorities apply several of these provisions through their own circulars. Verify the entitlement, the premium rate and the applicable ASR year with the planning authority handling your file before relying on any figure here for a feasibility or a submission.